A. Conceptual stage
B. Plan preparation stage
C. Implementation phase
D. Closing stage
A. Engineering
B. Value-added
C. Security category
D. All
A. Implement the change immediately
B. Submit change request to PMO
C. Reject the change request
D. Assess the impact of the change on other aspects of the project
A. Initiating
B. Planning
C. executing
D. Monitoring
E. Closure
A. Customer
B. Agent/channel
C. Customer Manager
D. SE
A. Scheme design and implementation
B. Project's key point, risk list and solutions (from SE )
C. IM Groups for H3C and Partner Interfaces, Reporting and Upgrades
D. R&M and Partner and H3C
A. TRUE
B. FALSE
A. 5CM
B. 10CM
C. 15CM
D. 20CM
1. Connect the ground wire;
2. Install the lugs and cabling rack;
3. Check the installation;
4. Install the main control board;
5. Install the power module;
6. Wear an anti-static wrist strap;
7. Assemble the service board;
8. Assemble the equipment to the cabinet
A. 1、3、2、5、7、6、4、8
B. 6、3、8、7、4、1、5、2
C. 6、2、8、4、7、1、5、3
D. 6、8、2、4、7、5、1、3
A. Do nothing
B. insert a false handle strip
C. insert a real handle strip
D. insert a full single board